|
|
AUTHOR(s) |
TITLE |
DATE |
PAGES |
|
T
R-170 |
J. B. Orlin |
The Dynamic Convex Programming Problem |
Mar 1980 |
12 |
|
TR-171 |
J. F. Shapiro and D. E. White |
Decomposition and Integration of Coal Supply and Demand Models |
Mar 1980 |
54 |
|
TR-172 |
J. B. Orlin |
Minimum Convex Cost Dynamic Network Flows |
Mar 1980 |
48 |
|
TR-173 |
J. B. Orlin |
Maximum Dynamic Network Flows |
Mar 1980 |
34 |
|
TR-174 |
G. R. Bitran, E. A. Haas and A. C. Hax |
Hierarchical Production Planning: A Single Stage System |
Mar 1980 |
41 |
|
TR-175 |
G. R. Bitran and A. C. Hax |
Disaggregation and Resource Allocation Using Convex Knapsack Problems with Bounded Variables |
Mar 1980 |
19 |
|
TR-176 |
D. E. White |
The Application of Mathematical Programming Decomposition Techniques to the Integration of a Large Scale Coal Energy Model |
Mar 1980 |
235 |
|
TR-177 |
S. C. Graves |
The Introduction of Feedback into a Hierarchical Production Planning System |
Mar 1980 |
26 |
|
TR-178 |
J. B. Orlin, M. A. Bonucelli and D. P. Bovet |
An O(n2) Algorithm for Coloring Proper Circular Arc Graphs |
Apr 1980 |
13 |
|
TR-179 |
G. R. Bitran, E. A. Haas and A. C. Hax |
Hierarchical Production Planning: A Two Stage System |
May 1980 |
37 |
|
TR-180 |
J. D. C. Little and M. D. Kelson |
Optimal Signal Timing for Arterial Signal Systems: Summary Report |
Apr 1980 |
83 |
|
TR-181 |
G. R. Bitran and J. M. Rivera |
An Efficient Point-Utility Theory Approach to Solve Binary Multicriteria Problems |
Sep 1980 |
30 |
|
TR-182 |
G. Sadiq |
Facility Location Problems in Spaces with Discontinuities in the Travel Medium |
Nov 1981 |
273 |
|
TR-183 |
E. H. Kaplan |
Managing the Demand for Public Housing |
Jun 1984 |
286 |
|
TR-184 |
R. R. Levary |
Optimal Control Problems with Goal Objectives |
Nov 1984 |
22 |
|
TR-185 |
P. Jaillet |
Probabilistic Traveling Salesman Problems |
Feb 1985 |
241 |
|
TR-186 |
P. T. Chapman |
Decision Models for Multistage Production Planning |
Oct 1985 |
232 |
|
TR-187 |
A. S. Minkoff |
Real-Time Dispatching of Delivery Vehicles |
Sep 1985 |
251 |
|
TR-188 |
J. B. Orlin, H. N. Psaraftis, D. Bienstock and P. M. Thompson |
Analysis and Solution Algorithms of Sealift Routing and Scheduling Problems: Final Report |
Aug 1985 |
180 |
|
TR-189 |
C. Schaack and R. C. Larson |
Cutoff Priority Queues: A Methodology for Police Patrol Dispatching |
Aug 1985 |
157 |
|
TR-190 |
R. Shull, J. B. Orlin, A. Shuchat and M. L. Gardner |
The Structure of Bases in Bicircular Matroids |
Dec 1986 |
42TR-191 |
|
TR-191 |
R. Shull, A. Shuchat, J. B. Orlin and M. L. Gardner |
Recognizing Hidden Bicircular Networks |
May 1987 |
53 |
|
TR-192 |
J. B. Orlin and R. K. Ahuja |
New Distance-Directed Algorithms for Maximum Flow and Parametric Maximum Flow Problems |
Jul 1987 |
37 |
|
TR-193 |
R. K. Ahuja, K. Melhorn, J. B. Orlin and R. E. Tarjan |
Faster Algorithms for the Shortest Path Problem |
Apr 1988 |
34 |
|
TR-194 |
D. J. Bertsimas |
Probabilistic Combinatorial Optimization Problems |
Sep 1988 |
171 |
|
TR-195 |
I. R. Webb |
Period and Phase of Customer Replenishment: A New Approach to Inventory/Routing Problems |
Jun 1989 |
296 |