To buy: Floor paint (1 can black, 1 can white) Gaff tape (1 roll, grey if possible) Drywall screws: 2 boxes 3" square drive 1 box 1 5/8" square drive 1 box 1 1/4" phillips 1 box 1" phillips Square drive bits (3) 2 .5" screw eyes 2 big sheets of posterboard for reveals -------------- Things remaining before Yeomen set completion Finish fixing stairs Build 1 triangle support dexion Mix floor paint put reveals on battlements paint battlements Repaint tops of flats w/ battlements Put bars in window flat set out dexion pieces --------------- Set Build Order of Events (the times listed here are rather optimistic, especially toward the end of the order of events) Get van(s) (start time: aroud 9 am) Load & move platforms, legs Stairs Flats Tools, paints, lumber (est. time: noon) Attach dexion to back platforms Attach wood legs to platforms Position platforms Screw platforms together (est. time: 5 pm) (in parallel with platform setup) Tape particleboard flooring to floor Attach battlements to flats Connect flats in manageable segments on floor Quickly dutch and repaint paint highest parts of flats paint masking flats, facings, reveals (once upper platforms are set up) Mount stairs Mount back-wall flats on platforms Buttress back wall (2x4x12', pipe attachment, jacks(?)) Return van (est. time: 11 pm) Mount sidewall flats Install masking flats (est. time: Sunday noon. By Sunday noon we *must* have the platforms and steps installed. Missing flats, especially masking flats, are okay.) Dutch seams Basecoat platforms, floor) Attach reveals Repaint over dutching Hang curtain behind window Attach facings (est. time: Monday evening) Monday before/during/after(?) cue-to-cue: install house Tuesday: whatever's left